We recently visited a site in West London which required repairs to badly installed and specified hoarding. The gates had been installed using wooden construction and the strong winds recently experienced had led to total failure. The rest of the hoarding had been done in interior grade plywood without correct design. When we arrived to survey the gates were on the floor! We installed these galvanised metal 4m site gates clad in 18mm primed OSB, a tidy and robust solution which helped secure the rest of the frontage. We went on to work on the inner site boundary to install proper hoarding.
Hoarding Repairs - West London
Updated: Jul 29, 2020
Comentarios